正确使用
混凝土搅拌机有利于施工的顺利进行,并且可以提高工程工作效率,如果没有正确使用会损害设备的机械部件,减少它的使用寿命。那么工作人员应该如何规范操作混凝土搅拌机呢?
The correct use of concrete mixer is conducive to the smooth progress of construction and can improve the work efficiency of the project. If it is not used correctly, it will damage the mechanical parts of the equipment and reduce its service life. So how should the staff operate the concrete mixer?
1、作业后,应及时将机内、水箱内、管道内的存料、积水放尽,并清洁保养机械,清理工作场地,切断电源,锁好电闸箱。
1. After the operation, the materials and water in the machine, water tank and pipeline shall be drained in time, the machinery shall be cleaned and maintained, the working site shall be cleaned, the power supply shall be cut off, and the electric switch box shall be locked.
2、仪表、指示信号准确可靠,混凝土搅拌机的操纵台应垫上橡胶板或干燥木板。
2. Instruments and indicating signals shall be accurate and reliable. The console of concrete mixer shall be padded with rubber plate or dry wood plate.
3、传动机构、工作装置、制动器等,均应紧固可靠,保证正常工作。
3. The transmission mechanism, working device and brake shall be fastened and reliable to ensure normal operation.
4、骨料规格应与搅拌机的性能相符,超出许可范围的不得使用。
4. The aggregate specification shall be consistent with the performance of the mixer, and those exceeding the permitted range shall not be used.
5、空车运转,检查搅拌筒或搅拌叶的转动方向,各工作装置的操作、制动、确认正常,方可作业。
5. When the vehicle is running empty, check the rotation direction of the mixing drum or mixing blade, and confirm that the operation, braking and confirmation of all working devices are normal.
6、进料时,严禁将头或手伸入料斗与机架之间,运转中不得用手或工具等物伸入搅拌筒内扒料出料。
6. During feeding, it is strictly prohibited to put the head or hand between the hopper and the frame. During operation, it is not allowed to put the hand or tools into the mixing drum to scrape and discharge materials.
7、料斗升起时,严禁在其下方工作或穿行。料坑底部要设料斗的枕垫,清理料坑时须将料斗用链条扣牢。
7. When the hopper is lifted, it is forbidden to work or walk under it. The bottom of the material pit shall be provided with a pillow pad for the hopper. When cleaning the material pit, the hopper shall be fastened with a chain.
8、向搅拌筒内加料应在运转中进行;添加新料须先将搅拌机内原有的混凝土全部卸出后才能进行。不得中途停机或在满载时启动搅拌机,反转出料者除外。
8. Feeding into the mixing drum shall be carried out during operation; Before adding new materials, all the original concrete in the mixer shall be discharged. Do not stop the mixer midway or start the mixer at full load, except for reverse discharging.
9、作业中,如发生故障不能继续运转时,应立即切断电源,将搅拌筒内的混凝土干净。
9. In case of failure and failure during operation, the power supply shall be cut off immediately to clean the concrete in the mixing drum.
10、作业后,应对搅拌机进行多方面清洗,操作人员如需进入筒内清洗时,须切断电源,设专人在外监护,或卸下熔断器并锁好电闸箱,然后方可进入。
10. After the operation, the mixer shall be cleaned in many ways. If the operator needs to enter the barrel for cleaning, he must cut off the power supply, assign a special person to monitor outside, or remove the fuse and lock the electric switch box before entering.
In addition, during winter construction, it is necessary to check whether there is ice before startup; After work, carefully remove the residual water in the mixing drum and the water supply system, turn off the water pump switch, and place the control handle at the "stop" position. For more information, please visit our website http://www.zkhntjbc.com Consult and understand.