混凝土搅拌机管理制度及操作工的工作要领

来源:http://www.zkhntjbc.com/ 日期:2020-11-06
概述:混凝土搅拌机的使用需要设定相关的管理制度,不仅要保养好设备,使用的时候要严格按照照做流程,且每一次的保养做好记录并归档,作为一个混凝土搅拌机的操作工,每一次的操作都要规范
混凝土搅拌机的使用需要设定相关的管理制度,不仅要保养好设备,使用的时候要严格按照照做流程,且每一次的保养做好记录并归档,作为一个混凝土搅拌机的操作工,每一次的操作都要规范,设备运行前要检查安 全性能,符合条件次啊能开机运行,下面小编详细介绍。
The use of concrete mixer needs to set up the relevant management system, not only to maintain the equipment, but also to strictly follow the follow-up process when using, and each maintenance should be recorded and filed. As a concrete mixer operator, every operation should be standardized, and the equipment should be checked before operation Full performance, meet the conditions, ah, can start running, the following small series of detailed introduction.
一、混凝土搅拌机计量管理制度
1、 Measurement management system of concrete mixer
1、认真执行计量法规、法令和有关规定、制度。
1. Conscientiously implement measurement laws and regulations, decrees and relevant regulations and systems.
2、每月由专(兼)职计量员对搅拌站专用计量设备、仪器、衡器少检查一次,并符合检测要求和标准。
2. The full-time (Part-time) metrologists shall inspect the special metering equipment, instruments and weighing instruments of the mixing station at least once a month and meet the testing requirements and standards.
3、技术负责人负责新购进设备、仪器使用前计量检定的检查工作,未经检定的设备禁止使用。
3. The technical director shall be responsible for the inspection of newly purchased equipment and instruments before use, and the equipment not verified shall not be used.
4、定期对计量设备、器具的使用情况进行检查,并对各种台帐、记录、检验等使用“量”的单位进行审核把关。
4. Regularly check the use of measuring equipment and instruments, and audit and check various accounts, records, inspection and other units using "quantity".
5、发现在用设备、计量器具、仪表超差应及时向搅拌站技术负责人汇报,联系地方计量检定部门进行重新校准。
5. If the equipment, measuring instruments and instruments in use are found to be out of tolerance, they shall be reported to the technical director of the mixing plant in time, and the local metrological verification department shall be contacted for recalibration.
6、正在使用的A、B类计量设备,一定建立计量设备档案,按照档案内容如实填写,并按检定周期提前向计量部门申请检定。
6. For class A and class B measuring equipment in use, it is necessary to establish a measuring equipment file, fill in the file truthfully according to the contents of the file, and apply to the measurement department for verification in advance according to the verification cycle.
7、对生产控制过程中的各项记录、台帐、报告等计量单位正确使用,使用的计量单位一定标准化,计量标准单位一定统一。

混凝土搅拌机
7. The measurement units such as records, accounts and reports in the process of production control should be used correctly. The measurement units used must be standardized and the measurement standard units must be unified.
8、计量检定的设备、器具修理、鉴定记录及使用说明、合格证明、检测合格证明、台帐一定纳入统一档案管理,在档案中实行“一机一档”式管理。
8. The repair and appraisal records and use instructions, certificates, test certificates and standing books of the equipment and instruments for metrological verification must be included in the unified file management, and the management of "one machine, one file" should be implemented in the archives.
9、所有在用计量设备发生故障及检修期手续务必齐全,记录清楚,完备归档。
9. All in use metering equipment failure and maintenance procedures must be complete, clear records, complete filing.
10、对有定期检查计量偏差要求的设备,应定期检查校核并及时填写有关记录。
10. For equipment with regular inspection of measurement deviation, regular inspection and verification shall be conducted and relevant records shall be filled in timely.
二、混凝土搅拌机操作工如何高能工作
2、 How to work with high energy for concrete mixer operator
1、操作工要严格按照混凝土搅拌站生产操作规程进行生产操作,严格执行安 全规程,保障安 全生产。严格执行技术部的配合比所规 定的各种材料数量,做到准确无误。
1. The operators shall carry out production operation in strict accordance with the production and operation regulations of concrete mixing plant, strictly implement the safety regulations, and ensure the safety production. Strictly implement the quantity of various materials specified in the mix proportion of the technical department to ensure the accuracy.
2、混凝土搅拌站开机前,一定得到生产调度通知,告知操作工搅拌机已检查完毕,可以正常运转,提供准确无误的水泥、粉煤灰、 外加剂、膨胀剂仓号,方可开机作业。
2. Before starting up the concrete mixing plant, the production scheduling notice must be obtained to inform the operator that the mixer has been inspected and can operate normally. The accurate warehouse number of cement, fly ash, admixture and expansion agent can be provided before starting operation.
3、操作工在启动设备后,观察计量初始值是否为零,如不在零点上,通知有关负责人进行核实,如称内有物料,清空后,方可调零。 如称内没有物料,须经确认后,方可调零。
3. After starting the equipment, the operator shall observe whether the initial value of measurement is zero. If not, inform the relevant person in charge for verification. If there is material in the scale, it can be adjusted to zero after it is emptied. If there is no material in the scale, zero can be adjusted only after confirmation.
4、操作工在工作过程中要服从本班调度统一指挥,按生产计划保质保量完成任务。每日生产完成后,或利用间歇时间,随时做好混 凝土搅拌站及其他设备的卫生,应做到
4. Operators in the process of work to obey the unified command of the shift scheduling, according to the production plan to complete the task with quality and quantity. After the completion of daily production or the use of intermittent time, the concrete mixing plant and other equipment shall be kept clean at any time